Official Name: Sturgeon R-V School District: Sturgeon Elementary and Middle School Renovations and Sturgeon High School Entry and Addition

Sturgeon-School-District

View The Project Plans 

Location: 210 W. Patton St. Sturgeon Mo 65284

Project Number #14-188 (associated with Paragon Architecture)

Architect: Paragon Architecture, Inc. 430 South Glenstone Avenue, Springfield, mo 417-885-0002

Structural and Civil Engineer: Toth & Associates 830 E. Primrose St, #200 Springfield, Mo 65807 (417) 888-0645

Mechanical Electrical and Plumbing Engineer (MEP engineer): Smith-Goth Engineers 3855 South Jefferson Springfield mo 65807 (417) 882-2200

Type of project: (work covered)

Prevailing wage project, tax exempt, funded by the Sturgeon R-V school district.

  • The sturgeon elementary and middle school renovation consists of the renovation of the elementary and gym restrooms, the girl’s and boy’s locker room, the replacement of flooring in the elementary corridor, along with floor replacement in two auxiliary rooms.
  • The sturgeon high school entry and addition consist of a new canopy, the renovation of the administration building and two classroom additions,(one of the classrooms is their new science class room.

 

Start Date: July 15th 2015 

Completion Date: February 15th 2016

Sturgeon-School-District

View Specs 

Sturgeon School District Renovation and Addition